Nuclear fusion reactor with toroidal superconducting magnetic coils implementing inertial electrostatic heating

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11482342
APP PUB NO 20200111583A1
SERIAL NO

16595266

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A nuclear fusion reactor includes a chamber containing plasma and two or more devices which include superconducting electromagnetic coils. At least one of the two or more devices may be biased to a high voltage to provide thermal energy to ions in the magnetic confinement region. In some examples, the chamber and the two or more devices can be coaxial and toroid shaped. In some examples, the chamber can be spherical or cylindrical with the two or more devices being toroid or elongated toroid shaped and formed on opposite faces of a cuboid. The two or more devices may be disposed in the chamber to provide a high-beta magnetic confinement region for the plasma.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HORNE TECHNOLOGIES INC1537 CALKINS AVE LONGMONT CO 80501

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Horne, Tanner L Longmont, US 3 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 25, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 25, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 25, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00