Aerodynamic noise reduction member, railroad vehicle brake disk unit, railroad vehicle disk brake, railroad vehicle wheel, and railroad vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11480223
APP PUB NO 20210025465A1
SERIAL NO

17044594

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An aerodynamic noise reduction member 30 includes: a plate-like support portion 32 sandwiched between a plurality of fins 24 and 26 of a brake disk 20 and a rotating member 102 of a railroad vehicle; and a plurality of protruding portions 34 protruding from the support portion 32. Each of the plurality of protruding portions 34 is provided in such a manner that, in a state in which the support portion 32 is sandwiched between the plurality of fins 24 and 26 and the rotating member 102, each of the protruding portions 34 partially occludes between the fastening fin 24 and the anchoring fin 26 adjacent to each other in a circumferential direction of the brake disk 20.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL CORPORATIONTOKYO JAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujimoto, Takahiro Tokyo, JP 39 120
Ichikawa, Yuki Tokyo, JP 36 120
Kato, Takanori Tokyo, JP 61 107
Kondo, Osamu Tokyo, JP 84 1196
Sakaguchi, Atsushi Tokyo, JP 47 186

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 25, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 25, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 25, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00