Attachment for making up or breaking out pipe

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11480019
APP PUB NO 20190106951A1
SERIAL NO

16215905

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An attachment is described that is configured for attachment to an arm of a piece of heavy construction equipment. The attachment is configured to rotate a section of pipe during break out (i.e. disconnection or disassembly) from another section of pipe and/or make up (i.e. connection or assembly) with another section of pipe. The attachment is configured to break the joint or torque the joint to a predetermined torque value, unthread or thread pipe, and lift the pipe under the power of the heavy construction equipment.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LAVALLEY INDUSTRIES LLCBEMIDJI MN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kay, Christopher G Roseville, US 9 101
Kilde, Jesse J Blackduck, US 6 83
Larson, Daniel L Bagley, US 7 97
Larson, Marvin N Bemidji, US 4 49
Lavalley, Jason Bemidji, US 34 376
Lavalley, Roger Bemidji, US 9 170
Michel, Matthew J St. Paul, US 14 219
Wurgler, Rodney York, US 5 76

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 25, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 25, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 25, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00