Mudslide erosion inhibitor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11479930
SERIAL NO

17481801

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A barrier structure for impeding erosion due to mudslides allows mud to enter through large holes in a barrier wall, and water separated from soil to drain out through smaller holes in a rear wall. An underlying reservoir can further stabilize the structure by rapidly collect water and/or mud. A backstop wall and/or an extension can be abutted to a top of the barrier wall to enhance mud collection during a mudslide. The structure can further include a penetrating passage enabling a fraction of impacting mud to flow through unimpeded, and/or a diverting wedge uphill of the apparatus diverts some impacting mud and debris while allowing a remainder thereof to pass through to the barrier wall. A plurality of the barrier structures can be installed such that mud flowing past an uphill structure impacts a downhill structure. The barrier structure can be constructed from biodegradable materials.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ABELES GARY EVERONA NJ

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abeles, Gary E Verona, US 24 112

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 25, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 25, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 25, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00