Bolster beam of railcar bogie

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11479275
APP PUB NO 20200108844A1
SERIAL NO

16706835

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bolster beam of a railcar bogie includes a bolster beam main body in which a pair of auxiliary air chambers respectively communicating with a pair of air springs are formed; and a stopper structure projecting upward from a car width direction middle portion of the bolster beam main body. An upper wall of the bolster beam main body includes a middle upper wall portion at which the stopper structure portion is provided; and a pair of outside upper wall portions adjacently located at both respective car width direction sides of the middle upper wall portion and joined to the middle upper wall portion. The pair of outside upper wall portions include respective upward bent portions that are located at a car width direction middle side and bent upward toward the stopper structure portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KAWASAKI RAILCAR MANUFACTURING CO LTD1-18 WADAYAMA-DORI 2-CHOME HYOGO-KU KOBE-SHI HYOGO 652-0884

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Isomura, Kazuo Kobe, JP 13 30
Narita, Tomohiro Nishinomiya, JP 19 203

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 25, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 25, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 25, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00