Manufacturing method of wire rod, manufacturing apparatus of wire rod, wire rod, and motor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11478840
APP PUB NO 20200139423A1
SERIAL NO

16626926

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a manufacturing method of a wire rod for forming a coil, the manufacturing method including the steps of: placing an element wire in a forming space surrounded by a plurality of split dies; and pressure-forming the element wire by moving the plurality of split dies in a direction of narrowing the forming space. In the step of pressure-forming the element wire, at least one of the plurality of split dies is moved, and the plurality of split dies each having a surface that changes in shape in a longitudinal direction of an element wire to pressure-form the element wire into the wire rod having a plurality of different cross-sectional shapes in the longitudinal direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIDEC CORPORATION338 KUZETONOSHIRO-CHO MINAMI-KU KYOTO-SHI KYOTO 6018205 ?6018205

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Maeda, Shigeru Kyoto, JP 67 628
Sumi, Shigeharu Kyoto, JP 24 161

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 25, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 25, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 25, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00