Functional protein derived from animal muscle tissue or mechanically deboned meat and method for making the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11477995
APP PUB NO 20200329732A1
SERIAL NO

16920475

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for producing a protein product for addition to raw meat wherein the source of the protein product is animal muscle or mechanically deboned meat. The animal muscle tissue is homogenized. Protein in the homogenate is solubilized. Solubilized homogenate is heated to a temperature required for pasteurization and/or sterilization according to known standards. The homogenate is then optionally adjusted to a value at which the protein precipitates. The protein product of the present invention is free of bacteria and toxins and can be used as meat or added to raw meat for delivery to a consumer as uncooked meat.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KEMIN PROTEINS LLC1900 SCOTT AVENUE DES MOINES IA 50317

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fielding, William R Hilton Head, US 46 226
Kelleher, Stephen D Ipswich, US 51 402

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 25, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 25, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 25, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00