Increasing capacitance of a capacitor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11476057
APP PUB NO 20210005395A1
SERIAL NO

16502900

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A chemical etch is performed on a sheet of material. An electrochemical etch is performed on the sheet of material after the chemical etch is performed on the sheet of material. A capacitor is fabricated such that an electrode included in the capacitor includes material from the sheet of material after the electrochemical etch was performed on the sheet of material. In some instances, the chemical etch included at least partially immersing the sheet of material in an etch bath that includes molybdenum. Additionally or alternately, the chemical etch can be performed for a period of time less than 60 s.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PACESETTER INC15900 VALLEY VIEW COURT SYLMAR CA 91342

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bowen, David Taylors, US 36 361
Hemphill, Ralph Jason Sunset, US 63 234
King, Justin Clemson, US 14 173
Marshall, Timothy Pickens, US 16 131

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 18, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 18, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 18, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00