Machine learning based train handling evaluation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11472452
SERIAL NO

16599830

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A train control system may include a data acquisition hub connected to a database and sensors associated with one or more locomotives, systems, or components of a train and configured to acquire data in association with inputs derived from contextual data relating to a plurality of trains being operated by experienced train engineers under a variety of different conditions and in different geographical areas for use as training data. A machine learning engine of the train control system may receive the training data from the data acquisition hub, encode a modified learning function as a statistical model of desirable train handling behavior, evaluate train handling behavior by comparing to the statistical model, and update a certification of one or more of a train engineer, a semi-autonomous control system, or a fully autonomous control system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PROGRESS RAIL SERVICES CORPORATION1600 PROGRESS DRIVE ALBERTVILLE AL 35950

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brand, John Ft. Worth, US 29 1070
Howard, Bradley Ft. Worth, US 21 1317

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 18, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 18, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 18, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00