Tool and system for measurement, design communication, ordering and manufacture of fluid handling systems and parts

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11468212
APP PUB NO 20200250358A1
SERIAL NO

16777716

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates generally to a system used to produce a prototype part and subsequently an accurate design specification for a fluid or gas handling system/hose and or tube assembly, followed by the subsequent communication of that specification into an ordering interface that processes the specification into a usable format as a means to accurately produce and re-create the original specification in a remote location by a specific manufacturing process, in order to supply the originator of the design an accurate, working part, produced in the specified materials in a rapid, convenient and cost effective manner. The process has global applications in various industries, markets and vehicle or machinery types, particularly where it is inconvenient or prohibitively expensive to have the work performed on-site by a technician.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DYME PERFORMANCE SYSTEMS INC3128 E VERMILLION ST WEST COVINA CA 91792

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Horwill, Timothy William London, GB 1 4
McGrath, Brendan James West Covina, US 1 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 11, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 11, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 11, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00