Multilayer flexible tube and methods for making same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11465395
APP PUB NO 20200369013A1
SERIAL NO

16879400

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multilayer flexible tube includes an inner layer including a melt processable fluoropolymer, wherein the melt processable fluoropolymer includes a terpolymer including a tetrafluoroethylene, a hexafluoropropylene, and a vinylidene fluoride (THV); a tie layer including a polymeric blend of a terpolymer including a tetrafluoroethylene, a hexafluoropropylene, and a vinylidene fluoride (THV) with a poly vinylidene fluoride (PVDF), a polyamide, a polyetheramide block copolymer, or combination thereof; and an outer layer including a melt processable polymer having a shore hardness less than a shore hardness of the inner layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAINT-GOBAIN PERFORMANCE PLASTICS CORPORATION31500 SOLON ROAD SOLON OH 44139

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Heskett, Morgan D Akron, US 2 0
Ludlow, James Medina, US 15 55
McCauley, Kevin M Town of Tonawanda, US 33 214
Tzivanis, Michael J Chicopee, US 109 858

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 11, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 11, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 11, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00