Automated manufacture of 3D objects from composite material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11465337
SERIAL NO

17523077

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Described is a method of manufacture of 3D objects from composite materials. The method includes the use of an extrusion nozzle configured to extrude the composite material, including a multistrand filament with a thixotropic acrylic matrix material surrounding the multistrand filament. Extruding a 3D object surface segment spanning in the air over at least a segment of a discontinuous work surface and operating concurrently a source of curing energy to pin and enhance the strength of a 3D object surface segment spanning in air. The 3D object extruded surface segment spanning in the air is sufficiently rigid and maintains its shape without the use of a mandrel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MASSIVIT 3D PRINTING TECHNOLOGIES LTD11 PESAKH LEV BET ZMORA LOD 7129361

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dvir, Nir Herzlia, IL 2 0
Garty, Shai Rehovot, IL 16 69
Miller, Gershon Rehovot, IL 18 486
Uzan, Moshe Bet Shemesh, IL 16 121
Yakubov, Igor Herzelia, IL 19 142
Zimerman, Erez Nes Ziona, IL 6 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 11, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 11, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 11, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00