Tillage implement with gauge wheels having hydraulic down-pressure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11464153
APP PUB NO 20210068330A1
SERIAL NO

16772087

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A tillage implement has a frame with a center section and first and second outer wing sections hingedly attached to respective outer ends of the center section. Controlling a pressure in a secondary side of a hydraulic circuit enables adjustment of the downward pressure precharge provided by hydraulic cylinders based on a desired stiffness of the implement. Flow from a hydraulic supply through a pressure-reducing valve puts the downward pressure precharge on gauge wheels. Once this desired downward pressure precharge has been achieved, flow from the hydraulic supply is shut off and a check valve holds the pressure such that the hydraulic cylinders hold the gauge wheels in the desired position.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AGCO CORPORATION4205 RIVER GREEN PARKWAY DULUTH GA 30096

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brinker, Jarret Lee Beloit, US 19 234
Hughes, Jeffrey Scott Beloit, US 4 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 11, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 11, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 11, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00