Power conversion device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11456678
APP PUB NO 20210336556A1
SERIAL NO

17287013

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In order to reduce noise current leaking out from a frame to which semiconductor devices constituting a three-level power conversion circuit are attached to the outside of a power conversion device, the frame to which the semiconductor devices constituting the three-level power conversion circuit with which the power conversion device is equipped are attached is configured to be electrically connected to a neutral point of the three-level power conversion circuit. The noise current leaking out from the frame is thereby drawn back to the neutral point of the three-level power conversion circuit to suppress the flowing out of the noise current to the outside of the power conversion device and reduce the noise current.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI LTDTOKYO TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akazawa, Shoya Tokyo, JP 1 1
Ozawa, Hiroyuki Tokyo, JP 99 1746

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 27, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 27, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 27, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00