Process for improving the production of benzene and toluene

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11453829
APP PUB NO 20200369970A1
SERIAL NO

16767939

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a process for the production of C6-C7 aromatic compounds from a hydrocarbon feedstock of naphtha type comprising a step of fractionating (2) the feedstock in order to obtain an upper stream and a lower stream, a step of catalytic reforming of the upper stream (6) and of the lower stream (9), a step of recombining (15) the reformate effluents obtained, a step of recontacting (16) and a step of stabilizing (19) the stabilized reformate effluents and a step of separating (22) the raffinate in order to recover C6 and C7 hydrocarbon compounds.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IFP ENERGIES NOUVELLES1 ET 4 AVENUE DE BOIS PRÉAU 92500 RUEIL-MALMAISON FRANCE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bertino-Ghera, Celine Corbas, FR 2 0
Pagot, Alexandre St Genis Laval, FR 29 227

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 27, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 27, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 27, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00