System and method for predicting failures of train components

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11453421
SERIAL NO

16599855

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system may include a data acquisition hub connected to databases and sensors associated with locomotives, systems, or components of a train and configured to acquire real-time and historical configuration, structural, and operational data in association with inputs derived from real time and historical contextual data relating to a plurality of trains. The system may include a virtual system modeling engine configured to receive results of a non-destructive evaluation of a train component, simulate in-train forces, determine a predicted time of failure for the train component based on an evaluation of stresses that have already been applied to the component and expected future stresses, and implement repair, replacement, or operational protocols for the train component before or at a repair facility that will be reached by the train ahead of a predetermined minimum threshold time period before the predicted time of failure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PROGRESS RAIL SERVICES CORPORATION1600 PROGRESS DRIVE ALBERTVILLE AL 35950

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brand, John Ft. Worth, US 29 1070
Howard, Bradley Ft. Worth, US 21 1317

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 27, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 27, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 27, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00