Voltage control and grid synchronization of microgrids in real time

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11451065
SERIAL NO

17742066

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method for synchronizing a utility grid and a microgrid including a diesel generator, a photovoltaic array and a wind turbine. In a grid connected mode, a microgrid voltage, a microgrid frequency and a microgrid phase angle are controlled by a grid side converter which generates a preset reference power at the utility grid frequency; and provides a real power and a reactive power to each of a plurality of loads. In an island mode, the diesel generator operates at a constant speed to generate power at the reference frequency and communicates the reference frequency to a wind turbine, and the microgrid supplies the real power and reactive power to each of the plurality of loads. In a resynchronization mode, a switched capacitor bank is charged to provide the voltage needed to reconnect the microgrid to the utility grid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KING FAHD UNIVERSITY OF PETROLEUM AND MINERALSDHAHRAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abido, Mohamed A Dhahran, SA 2 1
Hassan, Mohamed A Dhahran, SA 10 11
Worku, Muhammed Yibre Dhahran, SA 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 20, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 20, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 20, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00