Carbon nanotube based hybrid films for mechanical reinforcement of multilayered, transparent-conductive, laminar stacks

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11450446
APP PUB NO 20180144844A1
SERIAL NO

15571531

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-layered, transparent-conductive stack with improved mechanical robustness, and a method of making the same, is described. The multi-layered film includes a layer of a hybrid film and a layer of a transparent conductive oxide (TCO) coating that is sputter deposited and forms a contact with the hybrid film. The hybrid film includes an interconnected network of carbon nanotubes (CNTs) and a plurality of metal oxide nanoparticles (MONs). The plurality of MONs are randomly distributed in the interconnected network of CNTs forming an electrical contact with the CNTs.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NANO-C INC33 SOUTHWEST PARK WESTWOOD MA 02090

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Richter, Henning Newton, US 40 325
Sivarajan, Ramesh Shrewsbury, US 65 2195
Vejins, Viktor Concord, US 19 173

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 20, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 20, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 20, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00