Apparatus and method for optimizing control parameters of power plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11449017
APP PUB NO 20210223749A1
SERIAL NO

17133109

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus for optimizing control parameters of a power plant is provided. The apparatus for optimizing control parameters of a power plant includes: a model generator configured to configure a forecast model including a process model and a control model, a model corrector configured to correct a first parameter of the process model through operation data of a real power plant, and a tuner configured to tune a second parameter, which is a parameter related to a time delay of the forecast model, so as to have a target load increase rate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • Assignment data not available. Check PTO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chi, Hyung Keun Yongin, KR 5 5
Im, Jun Taek Changwon, KR 1 0
Jeon, Woo Won Yongin, KR 2 0
Jeong, Kwang Hun Changwon, KR 10 2
Kang, Moon Il Changwon, KR 1 0
Kim, Hyo Jun Suwon, KR 30 62
Kim, Young Oon Suwon, KR 2 5
Oh, Jeong Hyeon Changwon, KR 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 20, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 20, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 20, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00