Burner panel for a metallurgical furnace

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11448398
APP PUB NO 20210262657A1
SERIAL NO

17190359

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

One or more embodiments of a burner panel for a metallurgical furnace is described herein. The burner panel has a body. The body has a front face, a first side surface, and a second side surface. Additionally, the body has a hollow extending between the first side surface, second side surface, and the front face. A middle portion of the body extends from the hollow toward the interior face. A burner tube is disposed through the middle portion of the body. The burner tube has an exterior portion having an entry and an exit disposed at the font face. An internal mounting flange extends along the first side surface and the second side surface. The body of the burner panel has no internal plumbing for cooling.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SYSTEMS SPRAY-COOLED INC877 SEVEN OAKS BLVD SUITE 500 SMYRNA TN 37167

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chodl, Eric Smyrna, US 3 4
Coursey, Ron Smyrna, US 2 4
Ferguson, Scott A Murfreesboro, US 30 40
Ward, Troy D Franklin, US 24 37

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 20, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 20, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 20, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00