Rail system for an outdoor shelter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11447955
APP PUB NO 20200399905A1
SERIAL NO

17008390

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An outdoor shelter and a rail system for the outdoor shelter are described herein. The outdoor shelter may include at least one pair of support post members, each pair of support post members including a first support post member being spaced apart from a second support post member; a first guide rail member coupled to the first support post member; a second guide rail member coupled to the second support post member; and a shade support pole member slidably coupled to the first and second guide rail members, the shade support pole member being coupled to an end portion of a shade member of the outdoor shelter, and the shade support pole member configured to be slidably displaced along the lengths of the first and second guide rail members so as to allow an amount by which the shade member overhangs a side of the outdoor shelter to be user-adjusted.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUNJOY INDUSTRIES GROUP LTD5192 SUMMER RIDGE LANE GALENA OH 43021

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pan, Lianzhang Huzhou, CN 15 218
Zhu, Qi Jiaxing, CN 83 1812

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 20, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 20, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 20, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00