Method for preparation for the start of a parked fuel cell system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11444299
APP PUB NO 20210305601A1
SERIAL NO

17269757

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for the start preparation of a fuel cell system in a vehicle having a fuel cell and a system bypass where an air flow is conveyed by parts of the fuel cell system in order to dry the fuel cell. In a first temporal phase of the method, a larger part of the air flow is led through the fuel cell and a smaller part of the air flow is led through the system bypass, after which, in a second temporal phase, a larger part of the air flow is led through the system bypass and a smaller part of the air flow is led through the fuel cell.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CELLCENTRIC GMBH & CO KGNEUE STRASSE 95 73230 KIRCHHEIM/TECK-NABERN 73230

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Muetschele, Armin Weilheim, DE 7 17
Pastor, Nigorra Pere Antoni Tuebingen, DE 4 1
Schmalzriedt, Sven Esslingen, DE 16 24

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 13, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 13, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 13, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00