Testing system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11441971
SERIAL NO

17619932

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This testing system is provided with: an input side control device 5 for controlling an input side dynamometer to eliminate a deviation between a speed command signal w1ref and a speed detected signal w1; and an output side control device 6 for controlling output side dynamometer to eliminate a deviation between a torque command signal Tk1 ref and a torque detected signal Tk1. A control gain of the control device 5 is set such that the real part of a pole of a transfer function (w1/w1 ref) becomes greater toward the negative side than a value obtained by multiplying a resonant frequency by the negative sign, and a control gain of the control device 6 is set such that the real part of a pole of a transfer function (Tk1/Tk1 ref) becomes smaller toward the negative side than the real part of the pole of speed control system closed loop transfer function.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MEIDENSHA CORPORATIONTOKYO 141-6029

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akiyama, Takao Tokyo, JP 43 381

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 13, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 13, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 13, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00