capture and separation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11439976
SERIAL NO

16349693

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention concerns a process for manufacturing a porous carbonaceous monolith structure comprising the steps of (i) introducing a precursor material comprising particles comprising a halogenated polymer having a melting point in a mold; (ii) forming a shaped body comprising aggregates of the particles of the precursor material, by concurrently applying to the precursor material a pressure P ranging from 10 to 300 bars when the halogenated polymer is a vinylidene chloride homopolymer and from 10 to 150 bars when the halogenated polymer differs from a vinylidene chloride homopolymer, and maintaining the precursor material at a temperature T1 ranging from T1,min=20° C. to T1,max=Tm−50° C. wherein Tm is the melting point of the halogenated polymer, and; (iii) optionally cooling then demolding the shaped body; (iv) introducing the shaped body in a furnace; (v) causing the pyrolysis of the halogenated polymer in the furnace until the porous carbonaceous monolith structure is obtained.

First Claim

See full text

Other Claims data not available

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SYENSQO SA98 RUE DE LA FUSÉE BRUSSELS B-1130

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dubois, Eric Pierre Wasseiges, BE 6 2
Finsy, Vincent Halle, BE 10 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 0 Citation Count
  • C01B Class
  • 0 % this patent is cited more than
  • 3 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges9332712201 - 1011 - 2021 - 300501001502002503003504004505005506006507007508008509009501000

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 13, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 13, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 13, 2034