Fuel supply device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11435082
SERIAL NO

17333971

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fuel supply device includes: an outer tubular member; an inner tubular member inside the outer tubular member; and a flow distribution portion on an inner surface of the outer tubular member or an outer surface of the inner tubular member, wherein the flow distribution portion includes first and second distribution wall portions arranged apart from one another in an axial direction of the inner tubular member, the first distribution wall portion includes first individual wall portions spaced apart from one another along a first circumference of the inner tubular member, the second distribution wall portion includes second individual wall portions spaced apart from one another along a second circumference of the inner tubular member, at least some of the first individual wall portions are arranged to face spaces between at least some of the second individual wall portions, respectively, in the axial direction of the inner tubular member.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HANWHA AEROSPACE CO., LTD

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cho, Su Hyeong Changwon-si, KR 3 3
Jung, Seung Chai Changwon-si, KR 5 7
Kim, Ju Pyoung Changwon-si, KR 3 21
Kim, Sin Hyen Changwon-si, KR 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00