Motorized cart assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11433934
SERIAL NO

16892505

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A motorized cart assembly includes a cart that has a basket, a collapsible frame and a plurality of wheels. The basket has a height that is greater than a width of the basket to accommodate tent poles and a tent. The frame includes a pole support for insertably receiving a respective one of the tent poles to vertically orient the respective tent pole. A drive unit is coupled to the cart and the drive unit is in mechanical communication with respective ones of the wheels. The drive unit rotates the respective wheels when the drive unit is turned on thereby facilitating the cart to be self propelled. The drive unit is in wireless communication with a personal electronic device for remotely controlling the drive unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BUTLER KIMBERLYHATTIESBURG MS

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Butler, Kimberly Hattiesburg, US 12 83

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00