Hydrogen isotope separation methods and systems

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11433353
APP PUB NO 20200384411A1
SERIAL NO

16433500

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods and systems for the separation of hydrogen isotopes from one another are described. Methods include utilization of a hydrogen isotope selective separation membrane that includes a hydrogen isotope selective layer (e.g., graphene) and a hydrogen ion conductive supporting layer. An electronic driving force encourages passage of isotopes selectively across the membrane at an elevated separation temperature to enrich the product in a selected hydrogen isotope.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SAVANNAH RIVER NUCLEAR SOLUTIONS, LLC; CLEMSON UNIVERSITY RESEARCH FOUNDATION; GEORGIA TECH RESEARCH CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brinkman, Kyle S Clemson, US 8 26
Hitchcock, Dale A Aiken, US 4 0
Krentz, Timothy M Aiken, US 2 0
Serkiz, Steven M Aiken, US 11 16
Velten, Josef A Dallas, US 4 1
Vogel, Eric M Marietta, US 1 0
Young, Katherine T Atlanta, US 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 6, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 6, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 6, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00