Systems, apparatuses and methods for synchronization pulse control of channel bandwidth on data communication bus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11431523
APP PUB NO 20180351764A1
SERIAL NO

15779291

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An input/output (I/O) and control system for long distance communications and industrial applications having a bus and protocol for communications between field devices and a channel generator for monitoring and control of the field devices. The channel generator produces an offset square wave of configurable frequency on the bus, and sends a synchronization pulse of selected duration at the start of each bus scan cycle in a pulse train cycle to reset counters in the field devices before the bus scan cycle is repeated, to ensure field devices are synchronized, transmitters transmit on the correct channel, and receivers sample the pulse cycle at the correct time. Changing the synchronization pulse length increases bandwidth for shorter, less noisy and more stable systems and inversely decreases bandwidth for increased noise immunity and distance for longer, noisier and less stable systems.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HUBBELL INCORPORATED40 WATERVIEW DRIVE SHELTON CT 06484

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ilijic, Nik Glen Alpine, AU 5 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 28, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00