Optoelectronic component and method for producing an optoelectronic component

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11430922
SERIAL NO

16479198

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An optoelectronic component and a method for producing an optoelectronic component are disclosed. In an embodiment an optoelectronic component includes a semiconductor layer sequence having an active region configured to emit radiation at least via a main radiation exit surface during operation and a self-supporting conversion element arranged in a beam path of the semiconductor layer sequence, wherein the self-supporting conversion element includes a substrate and subsequently a first layer, wherein the first layer includes at least one conversion material embedded in a matrix material, wherein the matrix material includes at least one condensed sol-gel material, wherein the condensed sol-gel material has a proportion between 10 and 70 vol % in the first layer, and wherein the substrate is free of the sol-gel material and the conversion material and mechanically stabilizes the first layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OSRAM OLED GMBHWERNERWERKSTRASSE 2 REGENSBURG 93049

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bauer, Jürgen Wielenbach, DE 23 113
Eberhardt, Angela Augsburg, DE 40 159
Eisert, Dominik Regensburg, DE 56 1371
Frischeisen, Jörg Schwabmünchen, DE 12 88
Huckenbeck, Thomas Augsburg, DE 8 13
Peskoller, Florian Ingolstadt, DE 18 41
Schmidberger, Michael Schwabmünchen, DE 5 6
Schneider, Albert Thalmassing, DE 33 337

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 28, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00