Process for enzymatic hydrolysis of lignocellulosic material and fermentation of sugars

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11427844
APP PUB NO 20200255876A1
SERIAL NO

16859618

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a process for the preparation of a fermentation product from ligno-cellulosic material, comprising the following steps:

    a) optionally pre-treatment of the ligno-cellulosic material;b) optionally washing of the optionally pre-treated ligno-cellulosic material;c) enzymatic hydrolysis of the optionally washed and/or optionally pre-treated ligno-cellulosic material using an enzyme composition comprising at least two cellulase and whereby the enzyme composition at least comprises GH61;d) fermentation of the hydrolysed ligno-cellulosic material to produce a fermentation product; ande) optionally recovery of a fermentation product;wherein before and/or during the enzymatic hydrolysis oxygen is added to the ligno-cellulosic material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VERSALIS S P APIAZZA BOLDRINI 1 20097 SAN DONATO MILANESE (MI) 20097

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Noordam, Bertus Echt, NL 41 293

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 28, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00