Delamination container

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11427369
APP PUB NO 20200361651A1
SERIAL NO

16960624

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A synthetic resin delamination container formed by blow molding a preform assembly having an outer preform and an inner preform, at least either one of an inner surface of the outer preform and an outer surface of the inner preform being applied with a release agent. The delamination container has: an outer layer body including an outer mouth portion and a bottomed tubular body portion being continuous with the outer mouth portion; an inner layer body including an inner mouth portion and a volume-reducible and deformable storage portion peelably laminated on an inner surface of the body portion through a release agent layer formed by the release agent; and an outside air introduction port configured to introduce outside air between the outer layer body and the inner layer body, in which an applying amount per unit area of the release agent layer is 10 to 850 mg/m2.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YOSHINO KOGYOSHO CO LTDKOTO-KU TOKYO 136-8531

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chiba, Junichi Tokyo, JP 26 307
Sugane, Koji Tokyo, JP 2 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 28, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00