Method for generating a component by a power-bed-based additive manufacturing method and powder for use in such a method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11426797
APP PUB NO 20190193160A1
SERIAL NO

16330505

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The disclosure relates to a powder and a method for generating a component by a powder-bed-based additive manufacturing method, such as laser melting. The powder includes particles having a core and a shell. The particles have an alloy composition of the component. The concentration of higher-melting alloy elements is greater in the shell and the concentration of lower-melting alloy elements is greater in the core, wherein the surface of the particles is higher in comparison with particles with a constant alloy composition. This advantageously prevents the particles from caking together in the powder bed during the production of the component, and so the powder bed may also be subjected to high preheating temperatures of up to 1000° C.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SIEMENS ENERGY GLOBAL GMBH & CO KGOTTO-HAHN-RING 6 MUNICH 81739

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brunhuber, Christian Auerbach, DE 26 63
Schäfer, Martin Berlin, DE 53 481

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 28, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 28, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 28, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00