Lithium-ion-conducting composite material and process for producing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11424480
APP PUB NO 20190173130A1
SERIAL NO

16208642

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A lithium-ion-conducting composite material and process of producing are provided. The composite material includes at least one polymer and lithium-ion-conducting particles. The particles have a sphericity Ψ of at least 0.7. The composite material includes at least 20 vol % of the particles for a polydispersity index PI of the particle size distribution of <0.7 or are present in at least 30 vol % of the composite material for the polydispersity index in a range from 0.7 to <1.2, or are present in at least 40 vol % of the composite material for the polydispersity index of >1.2.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCHOTT AGMAINZ

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Drewke, Jochen Mainz, DE 9 24
Menke-Berg, Yvonne Wiesbaden, DE 11 29
Roters, Andreas Mainz, DE 41 199
Samsinger, Rolf Rüsselsheim, DE 7 23
Schmitt, Hans-Joachim Ockenheim, DE 13 78
Schneider, Meike Taunusstein, DE 29 234
Schuhmacher, Jörg Kornwestheim, DE 10 28
Treis, Philipp Mainz, DE 11 35

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 23, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 23, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 23, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00