Data centre

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11419245
APP PUB NO 20210345526A1
SERIAL NO

17273946

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A data centre, a method of cooling electrical equipment in a data centre, and a services module for a data centre, are disclosed. The data centre is for accommodating a plurality of racks of IT equipment and comprises: a) a plurality of hot aisles interleaved with a plurality of cold aisles separated by IT equipment rack storage areas; b) an air handling unit configured to supply cooling air to the cold aisles; c) a services area for accommodating at least one UPS switchboard for directing electrical power to a plurality of IT equipment racks, the services area comprising hot and cold zones, a hot zone being separated from a cold zone by at least one of (i) a UPS switchboard storage area and (ii) a partition; wherein, in use, cooling air is supplied to the UPS switchboard storage area from the air handling unit via the cold zone of the services area.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BRIPCO (UK) LIMITEDCHELTENHAM GL52 7DQ

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Favill, Aaron Leamington Spa, GB 3 4
Thornton, William Cheltenham, GB 17 295

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 16, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 16, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 16, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00