Femtosecond fiber oscillator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11417999
APP PUB NO 20200412077A1
SERIAL NO

16692467

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An optical assembly provides dispersion control, modelocking, spectral filtering, and/or the like in a laser cavity. For example, the optical assembly may comprise a diffraction grating pair arranged to temporally and spatially disperse a beam on a forward pass through the optical assembly, a reflective device at an end of the optical assembly, and a focusing optic arranged to create a beam waist at the reflective device. The beam waist created at the reflective device may cause the beam to be inverted on a reverse pass through the optical assembly, and a temporal dispersion and a spatial dispersion of the beam may be doubled on the reverse pass through the optical assembly to form a temporally and spatially dispersed output from the optical assembly.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LUMENTUM OPERATIONS LLC400 NORTH MCCARTHY BLVD MILPITAS CA 95035

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Muendel, Martin H Oakland, US 70 766
Pierrot, Simonette Dietikon, CH 6 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 16, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 16, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 16, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00