Method for producing thin film transistor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11417752
APP PUB NO 20210151585A1
SERIAL NO

16619943

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a method for producing a thin film transistor that has a gate electrode, a gate insulating layer, an oxide semiconductor layer, a source electrode and a drain electrode on a substrate. This method for producing a thin film transistor includes a step for forming the oxide semiconductor layer on the gate insulating layer by performing sputtering on a target with plasma. The step for forming the oxide semiconductor layer includes: a first film formation step in which only argon is supplied as a sputtering gas to perform sputtering; and a second film formation step in which a mixed gas of argon and oxygen is supplied as the sputtering gas to perform sputtering. A bias voltage applied to the target is a negative voltage of −1 kV or higher.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NISSIN ELECTRIC CO. LTD

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ando, Yasunori Kyoto, JP 42 399
Kishida, Shigeaki Kyoto, JP 7 11
Matsuo, Daisuke Kyoto, JP 53 270
Setoguchi, Yoshitaka Kyoto, JP 3 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 16, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 16, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 16, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00