Combustor dome via additive layer manufacturing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11402096
APP PUB NO 20200141579A1
SERIAL NO

16180529

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A combustor dome may be formed by way of additive layer manufacturing. The combustor dome may further include a raised outer surface and a recessed outer surface on a hot side of the combustor dome. The recessed outer surfaces may be closer to the cold side than the raised outer surfaces. The combustor dome may include a shadow surface defined between the raised outer surface and recessed outer surface. The shadow surface may define a corresponding cooling outlet in fluid communication with an internal cooling channel defined inside of the combustor dome. The cooling outlet may release air from the internal cooling channel to the hot axial side of the combustor dome.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROLLS-ROYCE CORPORATION450 S MERIDIAN STREET INDIANAPOLIS IN 46225

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dailey, Lewis Lebanon, US 2 3
DeBruhl, Christopher D Indianapolis, US 3 21
McCormick, Keith Indianapolis, US 7 39
Sauer, Kevin Plainfield, US 10 17
Smith, Duane Carmel, US 40 519

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 2, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 2, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 2, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00