Methods of forming an adhesive composition from asphalt shingle waste powder

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11401449
APP PUB NO 20210087443A1
SERIAL NO

16901208

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Non-limiting embodiments of the present disclosure relate to a method comprising: obtaining asphalt shingle waste (ASW) and performing grinding, screening, and separating steps on the ASW. In some embodiments, granules are removed from the ASW. In some embodiments, the method transforms ASW into ASW powder. In some embodiments, the ASW powder is formed into a plurality of briquettes. In some embodiments, at least one of: the ASW powder, the plurality of briquettes, or any combination thereof is fed into a mixing process that results in an ASW powder filled coating. In some embodiments, the ASW powder is formed into an adhesive composition.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BMRC LLC251 LITTLE FALLS DRIVE WILMINGTON DE 19808

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chich, Adem Kearny, US 93 1849
Chin, Richard Livingston, US 48 451
Dougherty, Michael Mount Arlington, US 45 162
Edelsward, Kris Lockport, US 16 38
Erickson, Kirby Waxahachie, US 16 38
Ferraro, Michael T Savannah, US 16 38
Kelley, Dale Flower Mound, US 19 44
Richardson, Paul Euless, US 57 588
Rufus, Isaac Bernard Newark, US 16 77
Svec, James Kearney, US 23 76
Williams, Overton Paterson, US 12 75

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 2, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 2, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 2, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00