Speed reducer, power system, straddle-type rail train, and rail transit system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11396927
APP PUB NO 20210285519A1
SERIAL NO

16334682

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A speed reducer, a power system, a straddle-type rail train, and a rail transport system are disclosed. The speed reducer includes: a box body; a speed-reducing mechanism, disposed in the box body; and a support shaft, a first end of the support shaft being supported on the box body, and a second end of the support shaft being connected to a high-speed end of the speed-reducing mechanism. The speed reducer according to the present disclosure achieves a more stable connection between a drive shaft and a speed-reducing mechanism and a more stable power transmission.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BYD COMPANY LIMITEDNO 3009 BYD ROAD PINGSHAN SHENZHEN 518118

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fu, Cailin Shenzhen, CN 3 3
Li, Daolin Shenzhen, CN 17 7
Luo, Hongbin Shenzhen, CN 51 502
Ren, Lin Shenzhen, CN 23 41
Yuan, Jianjian Shenzhen, CN 1 1
Zhang, Jintao Shenzhen, CN 58 270
Zhang, Xin Shenzhen, CN 895 4200

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 26, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 26, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 26, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00