Battery cross member configuration with structural nut channel

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11394074
APP PUB NO 20210175478A1
SERIAL NO

16709272

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A battery enclosure, support beam for a battery enclosure and method of manufacturing the support beam. The battery enclosure includes a base and the support beam is securable within the base. The support beam includes a body, a nut channel secured to the body, and a mechanical fastener attached to the nut channel. The nut channel is formed into a u-shaped channel. The mechanical fastener is attached to the nut channel and the nut channel is secured to the body of the support beam.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GM GLOBAL TECHNOLOGY OPERATIONS LLCP O BOX 300 DETROIT MI 48265-3000

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jensen, Charles E Shelby Township, US 31 298
Riley, Tyler A Macomb, US 4 0
Rochon, James A Sterling Heights, US 9 40
Swartzell, Terry A Ann Arbor, US 26 121
White, Andrew W Shelby Township, US 15 88

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 19, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 19, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 19, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00