Engine system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11391235
SERIAL NO

17452625

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An engine system is provided, including a controller which estimates a mass ratio (G/F) of intake air inside a cylinder (containing fresh air and burnt gas) to fuel, and controls devices of an engine at a given engine speed so that, while a demanded engine load is a first load, at least part of a mixture gas inside the cylinder combusts by flame-propagation when the estimated G/F is below a first G/F, and the entire mixture gas combusts by compression ignition when the estimated G/F is above the first G/F, whereas while the demanded load is a second load (>the first load), at least part of the mixture gas combusts by flame-propagation when the estimated G/F is below a second G/F (

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MAZDA MOTOR CORPORATIONJAPAN'S HIROSHIMA COUNTY GOVERNMENT IN THE NEW TOWN YUNJUN ANN 3 NO 1

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujii, Takuma Aki-gun, JP 30 55
Fujikawa, Tatsuya Aki-gun, JP 21 98
Hori, Junki Aki-gun, JP 7 4
Ito, Naoya Aki-gun, JP 20 65
Kaminaga, Takashi Aki-gun, JP 16 77
Matsuo, Ryohei Aki-gun, JP 10 12
Muto, Mitsuhiro Aki-gun, JP 13 23
Sasaki, Yuta Aki-gun, JP 75 160
Yamakawa, Masahisa Aki-gun, JP 48 672

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 19, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 19, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 19, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00