Method of manufacturing high-strength synthetic fiber utilizing high-temperature multi-sectional drawing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11390965
SERIAL NO

16462578

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of manufacturing a high-strength synthetic fiber utilizing high-temperature multi-sectional drawing, two-stage high-temperature multi-sectional drawing, or multi-stage high-temperature multi-sectional drawing. The method comprises the following steps: performing, on a synthetic resin, melt spinning or melt extrusion, cooling, multi-sectional high-temperature drawing, heat setting and a fiber surface treatment, wherein the multi-sectional high-temperature drawing comprises independently adjusting temperatures at a front section and a rear section of an furnace, and the temperature at the rear section is higher than that at the front section. The temperature adjustment is performed on different locations in the furnace and according to a crystallization orientation of a fiber molecular chain, significantly increasing fiber strength. The method is widely applicable to manufacturing of various types of fibers, enhancing application performance of the fibers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YIN SHI037006 SHANXI ROAD DATONG CITY QINGYUAN WEIDU STREET XICHENG APARTMENT BLOCK A 1202A DATONG SHANXI PROVINCE 037006

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shi, Feng Zhejiang, CN 154 802
Yin, Shi Zhejiang, CN 9 36

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 19, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 19, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 19, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00