Nacelle for an aircraft turbojet engine provided with a device for detecting deformation of its movable structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11390394
SERIAL NO

16467718

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A nacelle for an aircraft turbojet engine includes a thrust-reversing device with a fixed structure and a movable structure translatably movable along an axis substantially parallel with a longitudinal axis of the nacelle between a retracted position in which it provides aerodynamic continuity with the fixed structure of the nacelle during operation of the nacelle with forward thrust and a deployed position in which it opens a passage intended for the circulation of a diverted secondary air flow during operation of the nacelle with reverse thrust. The nacelle includes at least one position sensor configured and arranged in the nacelle for detecting a deformation of the movable structure exceeding a permitted predetermined deformation threshold.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAFRAN NACELLESROUTE DU PONT VIII 76700 GONFREVILLE-L'ORCHER 76700

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Heau, Alexis Gonfreville l'Orcher, FR 6 10
Hue, Corentin Gonfreville l'Orcher, FR 7 17
Kerbler, Olivier Gonfreville l'Orcher, FR 31 153
Valleroy, Laurent Georges Gonfreville l'Orcher, FR 24 130

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 19, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 19, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 19, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00