Additive manufacturing method and object manufactured thereby

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11390019
APP PUB NO 20210178693A1
SERIAL NO

16723202

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An additive manufacturing method and an object manufactured thereby are disclosed. The object includes a first component and a second component pivotally connected to each other through a rotation shaft. A first engaging element of the first component and a second engaging element of the second component spatially correspond to each other. When the object is manufactured in a manufacturing space, the first component is close to the second component, and the first engaging element and the second engaging element are disengaged with each other. After the object is manufactured, the first component is rotated relative to the second component at an adjustment angle around the rotation shaft. The first engaging element and the second engaging element are engaged with each other and locked, to form a use space of the object larger than the manufacturing space. It is beneficial to achieve the purpose of reducing the required manufacturing space.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TECO IMAGE SYSTEMS CO LTDTAIPEI CITY 11469

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Ting-Chun Taipei, TW 19 109
Chung, Ming-Chieh Taipei, TW 12 35

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 19, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 19, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 19, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00