Method for regenerating a toxified catalyst containing ruthenium or ruthenium compounds

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11389791
APP PUB NO 20210154657A1
SERIAL NO

16614062

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for regenerating a catalyst containing ruthenium or ruthenium compounds, which includes, optionally at elevated temperature, subjecting the catalyst to a hydrogen halide treatment, particularly a gas stream comprising hydrogen chloride, under non-oxidative conditions and, optionally at reduced temperature, to at least a two-stage oxidative post-treatment. The catalyst may have been poisoned by sulfur compounds. After the removal of sulfur, the catalyst is subjected to an oxidative post-treatment.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COVESTRO DEUTSCHLAND AGKAISER-WILHELM-ALLEE 60 LEVERKUSEN 51373

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Burbach, Thomas Bedburg, DE 6 49
Gerhartz, Frank Leverkusen, DE 10 19
Loddenkemper, Tim Dormagen, DE 28 30
Müller, Walther Pulheim, DE 5 6
Rittermeier, Andre Bochum, DE 6 0
Schmidt, Timm Neuss, DE 15 32
Venz, Michael Dormagen, DE 5 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 19, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 19, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 19, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00