Data processing method and apparatus for passive optical network system, and passive optical network system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11388495
SERIAL NO

17279718

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A data processing method and apparatus for a Passive Optical Network (PON) system and a PON system, the method including: a first partial bandwidth is allocated to a first Optical Network Unit (ONU) within a first time window, the first ONU having completed registration and being in a working state; and a first data frame from the first ONU is received within a time corresponding to the first partial bandwidth, and a second data frame from a second ONU is detected within the first time window, the second ONU having not completed registration.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZTE CORPORATIONZTE PLAZA KEJI ROAD SOUTH HI-TECH INDUSTRIAL PARK NANSHAN DISTRICT SHENZHEN GUANGDONG 518057

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Geng, Dan Shenzhen, CN 44 116
Guo, Yong Shenzhen, CN 88 834
Liu, Zheng Shenzhen, CN 491 1992
Yin, Yongjia Shenzhen, CN 8 54
Yuan, Liquan Shenzhen, CN 69 176
Zhang, Weiliang Shenzhen, CN 119 263

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 12, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 12, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 12, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00