Production and measurement of workpieces

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11385630
SERIAL NO

16768756

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of producing a workpiece which is successively loaded onto two or more machine tools and one or more machining operations are performed to produce one or more features of the workpiece on each machine tool. After the machining operations on both or all of the machine tools, the workpiece is passed to a common dimensional inspection station. At the common dimensional inspection station, dimensions of the features of the workpiece produced by the machining operations on the two or more machine tools are measured. Based on the results of measuring the dimensions of the features, two or more output signals are produced which respectively relate to the performance of the two or more machine tools which performed the machining operations. Each of the output signals is fed back to the machine tool which performed the respective operation, to adjust the production process of each corresponding machine tool.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RENISHAW PLCWOTTON-UNDER-EDGE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jonas, Kevyn Barry Clevedon, GB 24 285

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 12, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 12, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 12, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00