Method for producing a workpiece composite, and workpiece composite

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11383329
APP PUB NO 20190283188A1
SERIAL NO

16432074

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A workpiece composite and a method for producing the workpiece composite having at least two workpieces are provided. A first workpiece and a second workpiece are positioned relative to each other, and an integral connection between the end face of the first workpiece and the second workpiece is formed in a joint section by way of a thermal joining method. Prior to forming the integral connection, the first workpiece is provided with an indentation or embossing, which adjoins the end face, at least in the joint section, whereby the thickness of the first workpiece is reduced in the region of the end face.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BAYERISCHE MOTOREN WERKE AKTIENGESELLSCHAFTPETUELRING 130 MUENCHEN 80809

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bevc, Boris Munich, DE 5 0
Glueck, Bernhard Fuerstenfeldbruck, DE 17 5
Kirschner, Robert Olching, DE 14 2
Lindacher, Robert Hilgertshausen-Tandern, DE 3 0
Opel, Dietmar Aich Moosburg a.d.Isar, DE 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 12, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 12, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 12, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00