Pre-charge technique for improved charge pump efficiency

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11381164
SERIAL NO

17206860

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A charge pump includes first and second multiplier stages including first and second capacitor in series with an input node, a final multiplier stage including an output capacitor in series with the second capacitor and an output node, and pre-charge circuitry. The pre-charge circuitry is configured to charge the output capacitor to a first level during an initial phase of a charging operation, wherein the first level is equal to a supply voltage of the data storage system, and decouple a charging path of the pre-charge circuitry from the output capacitor in response to the output capacitor being charged to the first level. The first and second multiplier stages are configured to increase the charge of the output capacitor to second and third levels higher than the first level during second and third phases of the charging operation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SANDISK TECHNOLOGIES LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anantula, Pradeep Bangalore, IN 5 14
G, V S N K Chaitanya Bangalore, IN 2 0
Nittala, Venkata Bangalore, IN 2 1
Rehani, Ankit Bangalore, IN 4 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 5, 2026
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 5, 2030
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 5, 2034
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00