DC bias configuration for pin diode SPDT switch
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Jul 5, 2022
Grant Date -
May 6, 2021
app pub date -
Oct 28, 2020
filing date -
Oct 31, 2019
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A transmit/receive switching assembly includes a symmetrical PIN diode-based switch to selectively connect an antenna port to one of a transmit port and a receive port, transmit bias control circuitry that receives a first bias control signal, receive bias control circuitry that receives a second bias control signal, and shunt bias control circuitry coupled between the symmetrical PIN diode-based switch and a reference node. The first and second bias control signals are simultaneously and oppositely switchable between first and second voltage values and together configured to operate the switch between a transmit mode where RF signal flow is enabled from the transmit port to the antenna port and isolation is provided between the antenna port and the receive port, and a receive mode where RF signal flow is enabled from the antenna port to the receive port and isolation is provided between the antenna port and the transmit port.
First Claim
all claims..Other Claims data not available
Family
- No Family data available.
- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
SKYWORKS SOLUTIONS INC | 5260 CALIFORNIA AVENUE IRVINE CA 92617 |
International Classification(s)

- 2020 Application Filing Year
- H03K Class
- 2472 Applications Filed
- 1851 Patents Issued To-Date
- 74.88 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Nguyen, Chi Nang | Placentia, US | 1 | 5 |
# of filed Patents : 1 Total Citations : 5 | |||
Puente, Richard Mark | Westminster, US | 6 | 27 |
# of filed Patents : 6 Total Citations : 27 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- H03K Class
- 0 % this patent is cited more than
- 3 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Jan 5, 2026 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Jan 5, 2030 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Jan 5, 2034 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
Date | Code | Event | Description |
---|---|---|---|
Jul 05, 2022 | P | Publication | |
Jun 15, 2022 | STCF | INFORMATION ON STATUS: PATENT GRANT | free format text: PATENTED CASE |
Jun 06, 2022 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: PUBLICATIONS -- ISSUE FEE PAYMENT VERIFIED |
Mar 03, 2022 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS |
Dec 08, 2021 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: FINAL REJECTION MAILED |
Nov 29, 2021 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
Sep 10, 2021 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: NON FINAL ACTION MAILED |
Aug 20, 2021 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
Jun 29, 2021 | AS | ASSIGNMENT | free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:PUENTE, RICHARD MARK;NGUYEN, CHI NANG;SIGNING DATES FROM 20210402 TO 20210422;REEL/FRAME:056710/0044 Owner name: SKYWORKS SOLUTIONS, INC., CALIFORNIA |
May 06, 2021 | P | Published | |
Dec 03, 2020 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: APPLICATION DISPATCHED FROM PREEXAM, NOT YET DOCKETED |
Oct 28, 2020 | F | Filing | |
Oct 28, 2020 | FEPP | FEE PAYMENT PROCEDURE | free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |

Matter Detail

Renewals Detail
